Projects
Pond 4 & Waterfall Repairs: October 14, 2011 - Pond 4 and the waterfall are currently being repaired. Both require stabilization due to erosion, and will be foamed for support. The waterfall inlet pipe leaks and will be re-lined in the affected area to reduce cost. The vegetation has been removed to open up the waterfall area and allow for complete inspection and repair of all areas.
A poly-urea liner will be sprayed into Pond 4 to provide a sealed pond.





